KOM2002 Deliverables and other Important Documents

The technical co-ordinator (Partner 2, Omega) will distribute the tasks of deliverable production and will manage their submission to the CEC. Each deliverable development is managed by its main contractor as specified in the table below.

Documents with blue background are only available for project partners.

Back to project home page.

No
Deliverable title
Main contrac-
tor
Contrac
-tors
[1]
Date
Nature[3]
Dissem-
ination level
[4]
D0.1
Main project website (Web site) ( PDF format)
KTH
All
3
D+R
PU
D0.2
Project presentation (Web site) ( PDF format)
KTH
All
3
D+R
PU
D8.1
Access to the on-line translation engine. (Web service) ( PDF format)
Systran
Tech.
3
D+R
PP
D0.3

Community Outreach and Prevention Network
Requirements, Information Structure and Policies ( PDF format)

KTH
All
5
R
PU
D1.1
Existing content evaluation ( PDF format)
Ioannina
Med.
6
R
PU
D1.2
D5.1 Start of Service + D1.2 Test site using existing content
See D5.1 below.
KTH
All
6
D
PP
D1.3
Quality assurance plan ( PDF format) (Word format)

Editorial policy draft (PDF format)

ABIT
Med.
6
D
PU
D2.1
Content plan ( PDF format)

Naming of Web4Health Informational Pages Report D 2.1C (PDF format)

FH NON
Med.
6
R
PP
D5.1
D5.1 Start of Service + D1.2 Test site using existing content
D5.1 Start of Service ( PDF format) (ZIP format)

D 5.1A - KOM2002 Groupware
Use in Web4Health (PDF format) (Web service)

Dreamweaver and Word Templates
for Web4Health Web Design
Report D5.1B (PDF format) (RTF format)

Documentation on the files in the Web4health Templates folder ( ZIP format)

KTH
All
6
D+R
PU
D4.1
Monitoring, rating and logging plan ( PDF format)
KTH
All
8
R
PP
D0.4
Reports for the annual review
Report for the annual review 2003 (PDF format)
Omega
All
92
R
PP
D2.2
Internal service ready for user testing. ( PDF format)

Natural Language Question Answering System
Classification Manual ( PDF format) ( Slides handout, PDF format)

KTH
All
9
D+R
PU
D6.1
Preliminary exploitation and dissemination plan (Zipped Word Format, restricted access to this version)
NetDoktor
All
9
R
PP
D8.2
Prototype of the terminological workbench.(Word format)
Systran
Tech.
12
D+R
PP
D2.3
Public service ready and running (Web service) (PDF format)
KTH
All
12
D+R
PU
D8.3
Integration of the specialized terminologi in the existing MT language pairs.
(Word format, attachment not included)
Systran
All
14
D+R
PP
D7.1
Evaluation plan (PDF format)

Presentation May 2003 (Powerpoint format)

Ioannina
Med.
14
R
PP
D4.2
First report of stepwise refinement experience
( PDF format)
FH NON
All
14
R
PP
D8.4
Final version of the terminologoical workbench.
(PDF format, 2 parts)
Systran
Tech.
16
D+R
PP
D7.2
First evaluation report
(PDF format) +
Statistics on Web4Health usage October 2003 (PDF format)
Ioannina
Med.
16
R
PP
D6.2
Report of first promotion stage
(PDF format)
KTH
C3
16
R
PP
D3.1
Second stage start of operation.
Attachment A: How to translate the Web4Health web site to a new language (PDF format) (Word format)
KTH
All
18
D+R
PU
D5.2
Forum service status and evaluation report
(PDF format) (Word format)
Ioannina
All
18
R
PP
D8.5
Prototype of English to Swedish translation engine
(PDF format) (Word format)
Systran
6, 1
18
D+R
PP
D6.3
Final exploitation and dissemination plan
(Word format)
NetDoktor
All
20
R
PP
D3.2
Report of second stage, (PDF format)
Statistics on the Web4Health web site, (HTML format)
Omega
All
22
R
PP
D5.3
Final report of user interaction services (PDF format)
Omega
All
24
R
PU
D4.3
Final report of stepwise refinement experience
FH NON
All
24
R
PU
D7.3
Final evaluation report (PDF format)

Attachment A, An Evaluation of Web4Health Patients and Racket-hall Visitors: Use of a Website on Mental Health (PDF format) (RTF format)

Attachment B: A peer review of Web4Health (PDF format) (Word format)

Ioannina
All
24
R
PU
D7.4
Short final project report
(HTML format)

Full final project report
(PDF format)
Omega
All
24
R
PU
Post Multi-lingual content management, report at Terena Networking Conference, June 2005 (HTML format PDF format)
KTH
Post project report of work done

Contracts

Date
Document
July 2002 Initial CEC-KOM2002 contract (PDF format) (Funding table, Excel format)
May 2003 Consortium contract (Word format)

Meeting Notes

Date
Document
July 2002 Meeting notes Luxebourg meeting July 2002 (Word format)
October 2002 Meeting notes Ioannina meeting October 2002 (Word format)
November 2002 Chat log November 2002 (HTML format)
December 2002 Chat log December 2002 (HTML format)
January 2003 Chat log January 2003 (HTML format)
January 2003 Meeting notes Lüneburg meeting January 2003 (Word format)
March 2003 Chat log March 2003 (HTML format)
May 2003 Omega presentation May 2003 (Powerpoint format)
September 2003 Meeting notes Bologna meeting September 2003 (Word format)
December 2003 Meeting notes Paris meeting December 2003 (Word format)
March 2004 Meeting notes Goes meeting March 2004 (Word format)
June 2004 Meeting notes Copenhagen meeting June 2004 (Word format)

Periodic Reports

Date
Report
July 2003 Periodic Report 1, July to December 2002
August 2003 Periodic Report 2, January to June 2003
November 2003 Annual report 1, July 2003 to October 2003
February 2004 Periodic Report 3, July to December 2003
August 2004 Periodic Report 4, January to June 2004

 


[1] Lead contractor in bold face, other participating contractors in regular face.
[3] Please indicate the nature of the deliverable using one of the following codes:
R = Report
D = Demonstrator/Prototype
O = Other
[4] Please indicate the dissemination level using one of the following codes:
PU = Public
PP = Restricted to other programme participants (including Commission services and project reviewers).
CO = Confidential, only for members of the consortium (including Commission services and project reviewers).