KOM2002 Deliverables and other Important DocumentsThe technical co-ordinator (Partner 2, Omega) will distribute the tasks of deliverable production and will manage their submission to the CEC. Each deliverable development is managed by its main contractor as specified in the table below. Documents with blue background are only available for project partners. |
No
|
Deliverable title
|
Main contrac-
tor |
Date
|
Nature[3]
|
||
---|---|---|---|---|---|---|
D0.1
|
KTH
|
All
|
3
|
D+R
|
PU
|
|
D0.2
|
KTH
|
All
|
3
|
D+R
|
PU
|
|
D8.1
|
Systran
|
Tech.
|
3
|
D+R
|
PP
|
|
D0.3
|
Community Outreach and Prevention Network |
KTH
|
All
|
5
|
R
|
PU
|
D1.1
|
Existing content evaluation (
PDF format)
|
Ioannina
|
Med.
|
6
|
R
|
PU
|
D1.2
|
D5.1 Start of Service + D1.2 Test site using existing
content
See D5.1 below. |
KTH
|
All
|
6
|
D
|
PP
|
D1.3
|
ABIT
|
Med.
|
6
|
D
|
PU
|
|
D2.1
|
Content plan (
PDF format)
Naming of Web4Health Informational Pages Report D 2.1C (PDF format) |
FH NON
|
Med.
|
6
|
R
|
PP
|
D5.1
|
D5.1 Start of Service + D1.2 Test site using existing
content
D5.1 Start of Service ( PDF format) (ZIP format) D 5.1A - KOM2002 Groupware Dreamweaver and Word Templates Documentation on the files in the Web4health Templates folder ( ZIP format) |
KTH
|
All
|
6
|
D+R
|
PU
|
D4.1
|
Monitoring, rating and logging plan (
PDF format)
|
KTH
|
All
|
8
|
R
|
PP
|
D0.4
|
Reports for the annual review
Report for the annual review 2003 (PDF format) |
Omega
|
All
|
92
|
R
|
PP
|
D2.2
|
Internal service ready for user testing. (
PDF format)
Natural Language Question Answering System |
KTH
|
All
|
9
|
D+R
|
PU
|
D6.1
|
Preliminary exploitation and dissemination plan (Zipped Word Format, restricted access to this
version)
|
NetDoktor
|
All
|
9
|
R
|
PP
|
D8.2
|
Prototype of the terminological workbench.(Word format)
|
Systran
|
Tech.
|
12
|
D+R
|
PP
|
D2.3
|
KTH
|
All
|
12
|
D+R
|
PU
|
|
D8.3
|
Integration of the specialized terminologi in the existing MT
language pairs.
(Word format, attachment not included) |
Systran
|
All
|
14
|
D+R
|
PP
|
D7.1
|
Evaluation plan
(PDF format)
Presentation May 2003 (Powerpoint format) |
Ioannina
|
Med.
|
14
|
R
|
PP
|
D4.2
|
First report of stepwise refinement experience
( PDF format) |
FH NON
|
All
|
14
|
R
|
PP
|
D8.4
|
Final version of the terminologoical workbench.
(PDF format, 2 parts) |
Systran
|
Tech.
|
16
|
D+R
|
PP
|
D7.2
|
Ioannina
|
Med.
|
16
|
R
|
PP
|
|
D6.2
|
KTH
|
C3
|
16
|
R
|
PP
|
|
D3.1
|
Second stage start of operation.
Attachment A: How to translate the Web4Health web site to a new language (PDF format) (Word format) |
KTH
|
All
|
18
|
D+R
|
PU
|
D5.2
|
Ioannina
|
All
|
18
|
R
|
PP
|
|
D8.5
|
Systran
|
6, 1
|
18
|
D+R
|
PP
|
|
D6.3
|
Final exploitation and dissemination plan
(Word format) |
NetDoktor
|
All
|
20
|
R
|
PP
|
D3.2
|
Omega
|
All
|
22
|
R
|
PP
|
|
D5.3
|
Final report of user interaction services
(PDF
format)
|
Omega
|
All
|
24
|
R
|
PU
|
D4.3
|
Final report of stepwise refinement experience
|
FH NON
|
All
|
24
|
R
|
PU
|
D7.3
|
Final evaluation report (PDF
format)
Attachment A, An Evaluation of Web4Health Patients and Racket-hall Visitors: Use of a Website on Mental Health (PDF format) (RTF format) Attachment B: A peer review of Web4Health (PDF format) (Word format) |
Ioannina
|
All
|
24
|
R
|
PU
|
D7.4
|
Omega
|
All
|
24
|
R
|
PU
|
|
Post | Multi-lingual content management, report at Terena Networking Conference, June 2005 (HTML format PDF format) | KTH |
Post project report of work done |
Date
|
Document
|
---|---|
July 2002 | Initial CEC-KOM2002 contract (PDF format) (Funding table, Excel format) |
May 2003 | Consortium contract (Word format) |
Date |
Document |
---|---|
July 2002 | Meeting notes Luxebourg meeting July 2002 (Word format) |
October 2002 | Meeting notes Ioannina meeting October 2002 (Word format) |
November 2002 | Chat log November 2002 (HTML format) |
December 2002 | Chat log December 2002 (HTML format) |
January 2003 | Chat log January 2003 (HTML format) |
January 2003 | Meeting notes Lüneburg meeting January 2003 (Word format) |
March 2003 | Chat log March 2003 (HTML format) |
May 2003 | Omega presentation May 2003 (Powerpoint format) |
September 2003 | Meeting notes Bologna meeting September 2003 (Word format) |
December 2003 | Meeting notes Paris meeting December 2003 (Word format) |
March 2004 | Meeting notes Goes meeting March 2004 (Word format) |
June 2004 | Meeting notes Copenhagen meeting June 2004 (Word format) |
Date |
Report |
---|---|
July 2003 | Periodic Report 1, July to December 2002 |
August 2003 | Periodic Report 2, January to June 2003 |
November 2003 | Annual report 1, July 2003 to October 2003 |
February 2004 | Periodic Report 3, July to December 2003 |
August 2004 | Periodic Report 4, January to June 2004 |
[1] Lead contractor in bold face, other
participating contractors in regular face.
[3] Please indicate the nature of the
deliverable using one of the following codes:
R = Report
D = Demonstrator/Prototype
O = Other
[4] Please indicate the dissemination
level using one of the following codes:
PU = Public
PP = Restricted to other programme participants (including
Commission services and project reviewers).
CO = Confidential, only for members of the consortium (including
Commission services and project reviewers). |